Skip to main content

NS0-521 Implementation Engineer - SAN ONTAP Exam

  • NetApp
  • 5 free sample questions

About this exam

NS0-521 is the NetApp exam Implementation Engineer - SAN ONTAP Exam. Paid practice material for this exam is not available yet, but you can try its free sample questions.

Exam code
NS0-521
Vendor
NetApp
Practice questions
Not available yet
Free sample questions
5
Question bank last updated
Not available yet

Try 2 sample questions

Taken from the free sample set for NS0-521.

Question 1

When using FCP, what is the minimum number of FC switches needed to redundantly attach three ESXi hosts?

  1. Option A:

    0

  2. Option B:

    1

  3. Option C:

    2

  4. Option D:

    4

Show answer and explanation

Correct answer: C

When using Fibre Channel Protocol (FCP), the minimum number of FC switches needed to redundantly attach three ESXi hosts is 2. This setup ensures that each host has multiple paths to the storage, providing high availability and fault tolerance. Each ESXi host should be connected to both switches, allowing for continuous operation even if one switch fails.

For more information, refer to:

    NetApp Documentation on FC Switch Configurations

    NetApp Community Discussion on Redundant FC Setup

Question 2 (choose 2)

During maintenance of A NetApp AFF ONTAP cluster, which two steps are needed to move the SAN

UFs to new nodes that are members of a portset? (Choose two.)

  1. Option A:

    Remove the LIF from the portset.

  2. Option B:

    Disable the SLM feature for the node that hosts the LIF.

  3. Option C:

    Disable the zoning of the LIF WWPN.

  4. Option D:

    Take the SAN LIF offline.

Show answer and explanation

Correct answer: A, D

To move SAN LIFs to new nodes that are members of a portset during maintenance of a NetApp AFF ONTAP cluster, you should take the following steps:

    Remove the LIF from the portset : This ensures that the LIF is no longer associated with the current node, preparing it for the move to the new node.

    Take the SAN LIF offline : This step is necessary to make configuration changes without causing disruption to the SAN hosts. Once offline, the LIF can be moved to the new node and reconfigured as needed.

These actions help maintain the integrity and performance of the SAN environment during the migration of LIFs.

For more details, see:

    NetApp Documentation on Moving SAN LIFs

    NetApp Community on Moving LIFs

See all 5 free sample questions